Maintenance of Ruya Al Balad Hotel, Mecca

    • Air conditioning systems (HVAC): Preventive and operational maintenance of central cooling units (chillers) to ensure cooling efficiency during peak seasons.

    • Electrical work: Regular inspection of distribution panels and backup generators to ensure 24/7 power continuity.

    • Plumbing Management: Upgrade water and sewage systems to handle high visitor consumption.

  • The challenge: Working in a high-density area and needing to respond immediately to malfunctions without disturbing guests.

  • Result: Achieve 99% operational uptime and reduce energy consumption by 15% thanks to preventive maintenance.

  • Safety systems: Inspection and maintenance of alarm systems and fire pumps to ensure compliance with civil defense requirements.

  • Elevators: Preventive maintenance of elevators to ensure they can handle the high volume of pilgrims.

More projects and events

Start your next project with the pursuit of excellence

Do you have a project idea, event, or need maintenance service? Let us turn it into reality!